| No. |
Num |
Size |
Position |
Price |
Production fee |
| E-building signboard |
109/set,3 set in total |
2.1m×1m |
The corridor bridge inside T3E building |
2.4 million yuan/set/month |
Depending on the actual situation |
| No. |
E-building signboard |
| Num |
109/set,3 set in total |
| Size |
2.1m×1m |
| Position |
The corridor bridge inside T3E building |
| Price |
2.4 million yuan/set/month |
| Production fee |
Depending on the actual situation |
Notes*327 blocks in total: facing the apron: one group on the left and one group on the right side of the departure floor; A group on the left side of the arrival layer; There are 3 groups in total, with 109 yuan per group.