| No. | Num | Size | Position | Price | Production fee |
|---|---|---|---|---|---|
| NN-LQB1~ B23 | 23/set,3 set in total | 1.37m×5.53m | Terminal departure inner corridor bridge | 4.8 million yuan/set/year | 380 yuan/㎡ |
| No. | NN-LQB1~ B23 |
|---|---|
| Num | 23/set,3 set in total |
| Size | 1.37m×5.53m |
| Position | Terminal departure inner corridor bridge |
| Price | 4.8 million yuan/set/year |
| Production fee | 380 yuan/㎡ |